I have been very slack with the Blog since we moved in, but I thought I would add some pre-landscaping shots. The outside is pretty much a disaster zone with a bit of re-waterproofing going on in the front yard, and weeds going on everywhere else. Hopefully the landscaping is going to start in the next couple of weeks, so I will post some shots up as this progresses.
http://brookwaterorbust.blogspot.com
Sunday, February 5, 2012
Sunday, September 18, 2011
Day 174
I'm a bit slow with the posts, but we are now pretty much done. Drive and Pathways to be done, a bit of plumbing, a massive clean up (due to cutting out the stone bench tops after they were installed... long story) and some carpet and we can move in.
http://brookwaterorbust.blogspot.com
| Painting now finished at the front |
| Floors have been sanded and polished. This is the study. |
| Stainless wire is also complete |
| Outdoor tiling is also finished... Once the pool fence is up the pool surface can be done . Have a fair bit of cleaning / sealing to do on those tile though before that happens. |
| Showers screens and mirrors should be going on this week. |
| Dining room pendant |
| Main touchscreen... still work in progress, but my guess it will always be work in progress. |
| Video intercom system. One of these upstairs and downstairs. |
| One of my glass light switches. Most switches upstairs are this type. |
| Powder room pretty much finished. Full of dust though from cutting the basin holes in the stone. Unbelievable how much dust this generated. |
| Behind the bed in the main bedroom. |
| Ensuite tiling. Again very dusty. |
| Other type of glass switch used upstairs. This is the main bedroom. |
| Electric Door lock from the inside. |
| And outside. You enter a code or swipe a card to unlock the front door. Door can also be opened from the intercom. |
| Kitchen lights are all done now, except for an LED strip going under the overhead cupboards. Will wait till the glass splashbacks are in before I put this up. |
| Downstairs bathroom |
| Light switches used downstairs. |
http://brookwaterorbust.blogspot.com
Thursday, September 1, 2011
Day 157
A lot of things have been happening at the house, including my electrical work, hence the lack of posts, but I'm nearly done so thought I would get some photos up of the current progress. Not long now!
http://brookwaterorbust.blogspot.com
| Garage doors are on... |
| And front door stained. |
| Stone benchtops and sink... |
| I've still got all the kitchen lights to do. |
| Walk in robe. We used the Ikea stuff.... took a long time to install! Caroline's Side |
| Chris's Side |
| Completed Data Cabinet and Security System on a wall in the walk in robe. |
| Ensuite Stone benchtops |
| Tiling in Bathroom downstairs |
| Rumpus behind TV... went a little overboard |
| Stair Lights.... we have three flights with two lights in each flight |
| Deck paint is finished. Wire will be going in next week. Photo was taken at night.... deck usually doesn't look so orange. |
| Very busy Family room ceiling... |
| and wall. |
http://brookwaterorbust.blogspot.com
Subscribe to: