Saturday, May 14, 2011

Day 44

The bottom floor frame has now been completed.  Most of the floor joists for the top floor are now on, ready for the next level to be started next week.

Block work for the study has now been completed.  Still a bit left to go around the garage however.

Water tank has been swapped

Standing in the garage looking out to what will be the top floor

Standing at the back of the garage.  Stepped out section is our main bedroom, and after that is the family room

Looking towards kitchen and dining.  The deck will extend from the corner.

Room on the left is the laundry, right is the store room

Rumpus room.  Overhanging section above is the kitchen

Standing in laundry door.  To the right is the linen closet, straight ahead is the bathroom and toilet

Linen closet with store room in behind.  Stairs will wrap around the linen closet as they go up to the top floor.  

Store room on other side of this wall

Looking down the hall.  Three bedrooms to the right and rumpus to the left

Looking into the rumpus from the hall

Caroline and Charlotte in the rumpus room looking out to the pool

Looking at rumpus room from the terrace.  Deck will be above.

Terrace.  Smaller wall will have a door into the hallway

Standing on the top floor in the family looking out towards the south east

Looking east from the family room

Looking north east


At the bottom of the block looking up towards the fourth bedroom

On the other side of the block looking up towards the pool