Sunday, July 3, 2011

Day 97

A fair bit has happened since my last post.  All the internal walls are now sheeted, and John has started the outside cladding.  It's really starting to look like a house now.

The cladding on the top roof section is started.  Looking forward to seeing the front finished!

Garage 

Garage

At the last minute we decided to go for wall insulation.  If we built it in summer probably wouldn't have thought about it, but since it's been so cold lately we did it.

Study

Hall looking from the front door

Family Room

Kitchen

Behind the scaffolding you can John has started the "linea" clading.  Most of the upper level is this type with  bits of the bottom and up under the roof,  being vertical groove cladding.

We are happy with our choice on the green glass.  Doesn't look green looking out from the inside though.  Should look good with our white and grey colour choice.  This section uses the vertical groove cladding.

Downstairs bathroom all sheeted

She must have her broom at all times when she visits the house.  Pity she carries it by the bristles though.

Looking down the hall from the bottom of the stairs (well the bottom of the future stairs anyway)

Rumpus Room

Rumpus Room

Terrace... where the linea cladding meets the vertical groove

As above


http://brookwaterorbust.blogspot.com

No comments:

Post a Comment