Sunday, September 18, 2011

Day 174

I'm a bit slow with the posts, but we are now pretty much done.  Drive and Pathways to be done, a bit of plumbing, a massive clean up (due to cutting out the stone bench tops after they were installed... long story) and some carpet and we can move in.

Painting now finished at the front

Floors have been sanded and polished.  This is the study.



Stainless wire is also complete

Outdoor tiling is also finished... Once the pool fence is up the pool surface can be done .  Have a fair bit of cleaning / sealing to do on those tile though before that happens.


Showers screens and mirrors should be going on this week.




Dining room pendant

Main touchscreen... still work in progress, but my guess it will always be work in progress.

Video intercom system.  One of these upstairs and downstairs.

One of my glass light switches.  Most switches upstairs are this type.

Powder room pretty much finished.  Full of dust though from cutting  the basin holes in the stone.  Unbelievable how much dust this generated.

Behind the bed in the main bedroom.

Ensuite tiling.  Again very dusty.

Other type of glass switch used upstairs.  This is the main bedroom.

Electric Door lock from the inside.
And outside.  You enter a code or swipe a card to unlock the front door.  Door can also be opened  from the intercom.

Kitchen lights are all done now, except for an LED strip going  under the overhead cupboards.  Will wait till the glass splashbacks are in before I put this up.

Downstairs bathroom

Light switches used downstairs.





http://brookwaterorbust.blogspot.com

No comments:

Post a Comment