Friday, April 22, 2011

Day 24

We now have a bottom slab, our backyard retaining wall, waterproofing, a filled in garage ready for the top slab,  and fence posts.  If the weather holds up in the week after easter, we will have a top slab and pool completed.  Once these things happen, we will start to see the house go up pretty quick.



Garage pit has now been filled and concrete piers have been poured

Black stuff is water proofing, concrete lumps are the piers

They built a dirt ramp to get machines into the garage pit

Bottom Slab, looking into laundry and store room.

Standing in the "garage pit" and looking down to where the pool will be dug next week. 

Looking down on the bottom slab from the garage pit.  You can see the recently completed backyard retaining wall.

A better shot of the new retaining wall

Bottom Slab, looking into the rumpus room.

Fence posts where done while we still had good access to the backyard.

Looking at the bottom slab from the back.  Above the block wall is the garage.  The study to the right of the garage is still yet to be finished.  It doesn't have a slab floor so I guess there is no rush to get this done.

Standing in the bathroom looking through the rumpus to the pool.

The bedroom wing.

Standing at the bottom of our block, looking over the backyard retaining wall to the garage block wall

This has nothing to do with the progress on the house.  It's just cute.