| Standing roughly in the pool. The skinny part is the small covered area outside the rumpus room. The kitchen is above. |
| Driveway will start just to the left. |
| Foundations for the front of the garage. The actual floor of the garage will be raised up a fair bit from the current level. |
| Back of the garage. The lower level will be the downstairs bathroom |
| The downstairs slab. The squares give you a bit of an idea where the rooms will be. |
| The square closest is the study with the entry next to it. The study will be out of the ground quite a bit, however the front will be filled up so the entry (and driveway) will be level. |
| Site manager and assistant site manager. Caroline isn't taking orders very well though. |
| Looking up at the study. Obviously there is a skill to stepping concrete like that without form work. |
| Entry to the store room which continues on under the internal staircase. There will be about a 3m block wall build for the length of the house here that will be backfilled for the garage slab. |
| From the right, laundry, rumpus and patio (under deck). Pool will be to the left of the photo. |
| Under deck patio |
| Looking back to the top of the block. |